FFP Guides

ServiceM8 form

Free ServiceM8 test and tag form and register

This is a ServiceM8 Form for in-service testing under AS/NZS 3760:2022. It records each item's ID, class, environment, visual check, earth continuity, insulation resistance, polarity, RCD trip time, result and next due date. Run it against ServiceM8 assets and the Asset Register prints the client's test and tag register.

Last checked 25 Sep 2026 against the sources listed at the end of this page.

Free form ยท AS/NZS 3760:2022

Test and tag form for electrical

A per item test record PDF in the job diary and, with Asset Management, a per job service report and a per customer test and tag register.

The form: 30 questions

SectionQuestionTypeReq.Notes
Site and testerSite or area testedTextYesBuilding, floor or room. Prints on the register header.
Site and testerTester nameTextYesNeeded on the tag in QLD unless a licence number is shown instead.
Site and testerTester licence or competency numberTextElectrical contractor or worker licence number, or the competency unit held. One of name or licence must appear on a QLD tag.
Site and testerTest instrument and calibration due dateTextYesAS/NZS 3760:2022 expects the tester to be verified against a calibrated source within the maker's timeframe.
ItemItem ID or tag numberTextYesMatch the barcode label if you use ServiceM8 assets.
ItemItem descriptionTextYesFor example: extension lead 10 m, kettle, drop saw.
ItemMake, model and serial numberText
ItemLocation of itemTextYes
ItemEquipment typeChoice
Appliance / Cord extension set / Portable outlet device (powerboard) / Portable RCD / Fixed RCD / Other
Yes
ItemEquipment classChoice
Class I (earthed) / Class II (double insulated) / Not applicable (RCD)
YesClass II items skip the earth continuity test.
ItemEnvironmentChoice
Construction or demolition / Factory, workshop, maintenance or fabrication / Flexed, open to abuse or hostile / Not flexed, not open to abuse / Residential areas of hotels, motels, hostels / Commercial cleaning / Hire equipment
YesDrives the retest interval. See the due date calculator.
InspectionVisual inspection resultChoice
Pass / Fail
YesPlug, cord, sheath, strain relief, enclosure, guards, markings.
InspectionVisual inspection defects foundMultiple choice
Damaged plug / Damaged cord or sheath / Inner cores exposed / Insulation tape repair / Damaged enclosure / Missing guard / Other
Insulation tape is not an acceptable repair for a damaged cord.
TestsEarth continuity resistance (ohms)NumberClass I and cord sets only. Commonly cited limit: not more than 1 ohm.
TestsInsulation resistance (megohms)NumberCommonly cited limit: at least 1 megohm. Leave blank if a leakage current test was used instead.
TestsLeakage current (mA)NumberAlternative to insulation resistance where the item must be energised, for example items with switched electronics.
TestsPolarity (cord sets and powerboards)Choice
Correct / Incorrect / Not applicable
Yes
RCDRCD typeChoice
Type I (10 mA or 30 mA) / Type II (above 30 mA) / Not an RCD
Yes
RCDPush button testChoice
Tripped / Did not trip / Not applicable
Yes
RCDRCD trip time (ms)NumberRecord the measured operating time at rated residual current. Check it against the maximum for the RCD type in your copy of AS/NZS 3760:2022.
ResultOverall resultChoice
Pass / Fail
Yes
ResultAction on failChoice
Out of service tag fitted, returned to owner / Repaired and retested / Disposed with owner's consent / Not applicable
YesA failed item gets a durable danger tag and is withdrawn from use.
ResultTag colour (construction sites)Choice
Red (Dec to Feb) / Green (Mar to May) / Blue (Jun to Aug) / Yellow (Sep to Nov) / Not a construction site
Yes
ResultDate testedDateYes
ResultRetest intervalChoice
3 months / 6 months / 12 months / 2 years / 5 years
YesSet by environment and state rules, or a documented risk assessment.
ResultNext test dueDateYesDate tested plus the interval. This date goes on the tag and the register.
ResultPhoto of item with tag fittedPhotoYes
ResultPhoto of defectPhoto
ResultCommentsText
Sign offTester signatureSignatureYes

Set it up in ServiceM8

  1. In ServiceM8 open Settings > Forms > Add Form and name it Test and tag.
  2. Add each question above in order, choosing the matching question type (Choice means Multiple Choice, Multiple choice means Multiple Choice (Multi-answer)), and tick Mandatory where required is true.
  3. Use letters and numbers only in question wording: ServiceM8 warns that special characters can break PDF generation, so write ohms and megohms as words.
  4. Click Download Sample Template to get a Word file with every Template Field Code, add your logo and layout, and upload it as the form template.
  5. Turn on the Asset Management add-on, create an asset type called Portable electrical equipment, and link this form to it so testers scan a label and complete the form per item.
  6. In Settings > Assets > Setup Asset Types > Template Setup, choose which form answers appear as columns on the service report and the Asset Register (item ID, location, result, date tested, next due).
  7. Test it on a dummy job with one Class I lead, one Class II appliance and one RCD before your techs use it.

What the form records, and why each field is there

AS/NZS 3760:2022 changed what a good record looks like. The 2022 edition asks service providers to record the actual measurement for each test (earth continuity resistance, insulation resistance, leakage current) rather than a bare pass or fail, so the form below has a number field for every reading. In Australia keeping records is recommended rather than mandatory under the standard, but a register with readings is what an auditor, insurer or principal contractor will ask you for.

In Queensland the tag itself also has rules. For service, office, manufacturing, amusement and rural work, the Electrical Safety Regulation 2013 requires the tag to show the prescribed details: the test date or the retest date, plus the tester's name or a licence number. The form captures both so the tag and the register always agree.

How it fits ServiceM8

ServiceM8 Forms support eight question types: Text, Text (Multi-line), Number, Date, Multiple Choice, Multiple Choice (Multi-answer), Photo and Signature. Any question can be ticked as compulsory, and every completed form becomes a PDF saved to the job diary. The list below uses only those types, so you can build it exactly as written.

A plain form works once per item: the tester fills it in again for each appliance. The better setup is ServiceM8's Asset Management add-on. Each appliance becomes an asset with a barcode label, the tester scans it, completes this form against it, and ServiceM8 shows the past answers for that asset. At job completion ServiceM8 builds a service report listing every asset tested on that job, and Settings > Assets > Asset Register prints every asset for the customer in one PDF. That PDF is the test and tag register you hand the client.

Pick the interval before you write the due date

The due date depends on the environment, not the appliance. AS/NZS 3760:2022 Table 2.4 runs from 3 months on construction sites to 5 years for equipment that is not flexed or open to abuse, and Queensland adds its own minimums for some work types. The form asks for the environment first and then the interval, so the tester has to make that call on site. Use the test and tag due date calculator to check an interval before you set up the choice list.

Readings and limits to keep in view

Common pass limits cited from the standard are an earth continuity resistance not above 1 ohm and an insulation resistance of at least 1 megohm. For RCDs the standard sets a maximum trip time by type, and the form records the measured trip time in milliseconds so the result can be checked later. Put these limits in each question's note so a new tester sees them while testing, and check them against your own copy of the standard, because Standards Australia sells it and summaries can lag.

What this form will not do

  • ServiceM8 Forms do not calculate one field from another, so Next test due is entered by the tester rather than worked out from the interval.
  • Without the Asset Management add-on each item is a separate form PDF in the job diary and there is no combined register.
  • The form records results; it does not replace the tester's competency, a calibrated instrument or the printed tag fitted to the item.
  • Pass limits in the notes come from published summaries of AS/NZS 3760:2022, which is paywalled. Check them against the standard before relying on them.
  • Construction sites are tested under AS/NZS 3012 as well as AS/NZS 3760, and a principal contractor may set stricter site rules.

Sources

  1. AS/NZS 3760:2022 asks service providers to record the actual test measurements (for example earth continuity resistance, insulation resistance, leakage current) rather than pass or fail only; in Australia records should be kept, in New Zealand they shall be kept. Test & Tag Training, checked 25 Sep 2026.
  2. In Queensland the prescribed details on a test tag are at least one of the test date or the retest date, plus at least one of the tester's name, the tester's or employer's electrical contractor licence number, the corporation's name, or the tester's electrical worker licence number. Electrical Safety Regulation 2013 (Qld), s 97 definitions (current as at 27 March 2026), checked 25 Sep 2026.
  3. ServiceM8 Forms question types are Text, Text (Multi-line), Number, Date, Multiple Choice, Multiple Choice (Multi-answer), Signature and Photo; a question can be made compulsory; completed forms are converted to PDF and saved to the job diary. ServiceM8 Help Center, checked 25 Sep 2026.
  4. With the ServiceM8 Asset Management add-on, forms can be completed against an asset many times, each question shows past values for that asset, and Settings > Assets > Asset Register produces a PDF of all assets for one customer including results of forms completed on them. ServiceM8 Help Center, checked 25 Sep 2026.
  5. Earth continuity must not exceed 1 ohm and insulation resistance must be at least 1 megohm under AS/NZS 3760:2022. ETA Training, checked 25 Sep 2026.
  6. Construction sites use the quarterly tag colour sequence: red December to February, green March to May, blue June to August, yellow September to November. Test & Tag Training, checked 25 Sep 2026.